Case Study: Rausikko Stormwater Management System – Drummond Road, Niagara Falls

Project Overview

A new commercial development on Drummond Road in Niagara Falls needed a clear and reliable way to manage extra stormwater. The new parking areas and building surfaces created more runoff than the land could naturally absorb. To handle this, our team supplied a Rausikko modular stormwater management system.

Client & Stakeholders

The Challenge

As the site grew, so did its stormwater runoff. Without proper control, heavy rainfall could overload the local stormwater system. This risk included flooding, stress on pipes, and higher maintenance costs. The City needed a solution that was easy to install, strong enough for future construction, and able to store and release water safely.

The Solution

We supplied the Rausikko modular system because it offers strong performance and simple design. Peters Excavating installed the system before surface construction began, which ensured smooth progress for the project.

Why Rausikko Worked

  • Modular Design: It fits different layouts and site conditions.
  • Large Storage Volume: The system holds a high amount of water compared to its footprint.
  • Strong Structure: It stays stable under parking lots and commercial areas.
  • Controlled Release: It holds water during storms and then releases it slowly into the municipal network.

Installation

Peters Excavating installed the system efficiently and followed all design requirements. Their work prepared the site for the future commercial build while keeping the City’s stormwater goals in mind.

Results

The Rausikko system now helps the site manage stormwater safely and effectively. It collects runoff from paved surfaces, stores it underground, and then releases it at a safe, steady rate. As a result, the City avoids excess strain on its stormwater network. This also reduces the chances of flooding and improves long‑term system performance.

Summary

The Drummond Road project shows how the Rausikko system offers a practical, long‑lasting solution for sites that need dependable stormwater control. With strong teamwork between Devron, Peters Excavating, and the City of Niagara Falls, the project now supports both current and future development needs while protecting local infrastructure.

Rausikko geocellular system being delivered on a transport truck.
site prep for rausikko system